Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405. (a)by manual means (including all t&p, labour, material, royalty tax but excluding gst) providing and applying primer coat of low porosity with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 kg/sqm using mechanical means as per technical specification clause 502. (including all t&p, labour, material, royalty tax but excluding gst) providing and applying tack coat with vg-10 using bitumen distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated wi
Sector: PWD