Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. dewatering charge ch-19 sl no-6 excavation for roadwork in soil with hydraulic exavator of 0.9 bucket capacity incluiding cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift up to 1.5 m and laed upto 1000 m as per technical specification clause 302.3 excavation in foundation in ordinary soil (loamclay or sand)including 30 m.from the foundation lift upto 1.5 meter and lead upto 30 meter.and including filling watering and ramm
Sector: RDPR