Details: part a (bituminous work) earth work in cutting or in filling in embankment in ordinary soil excavation in to be regular pit not exceeding 0.5 m and earth work in embankment to be in 20 cm layer ramming and dressing the surface to required level and also including 1.5 m lift and lead and including all material, labour, labour cess, t&p royalty, all tasex etc. complete as per diretcion by i-in-c but excluding g.s.t. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion ss. 3.5% and opc cement @1% by wet of mix.and including all material, labour, labour cess, t&p royalty, all tasex etc. complete as per diretcion by i-in-c but excluding g.s.t.
Sector: PWD