Description: Financial Year 24 25 Under Reconstruction Work of Gawan Babrala Shugar Mill to Cane Yard road Name of Work Financial Year 24 25 Under Reconstruction Work of Gawan Babrala Shugar Mill to Cane Yard road
Details: Part A (Bituminous Work) Earth work in cutting or in filling in Embankment in ordinary soil excavation in to be regular pit not exceeding 0.5 m and earth work in embankment to be in 20 cm layer ramming and dressing the surface to required level and also including 1.5 m lift and lead and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Sector: PWD