Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side providing concrete for plain concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 (1:3:6) providing concrete for reinforced concrete in sub structure complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 m-20 supplying, f
Sector: RDPR