Details: earthwork in excavation of ordinary soil and soil mixed with kankar. earthwork in excavation of ordinary soil in foundation extra for wet earth work excluding dewatering withwater. extra for slush and lahel for earthwork of foundation. extra for lift above 1.5 m for every 0.3 meter lift or part thereof in foundation upto 3 m high banks plain cement concrete with 1:3:6 cement, sand, stoneballast (20-50 mm) including cost of material at site labour, t&p etc. required for proper completion of work cut stone r.c.r stone masonry work in 1:3 cement and sand mortar cut stone r.c.r stone masonry work in 1:4 cement and sand mortar deep stuck/raised pointing in 1:2 cement, sand mortar over stone masonry plaster work in 1:3 cement sand mortar over stone masonary plain cement concrete work in 1:2:4 cement, sand, stone grit (10-25mm) over top of p.c.c. 1:3:6 and r.c.r. masonary dry stone boulder filling dewatering, diesel pump set of 5-8 h.p s/f of sign board
Sector: Irrigation