Details: providing, laying, spreading and compacting stone aggregates of 53-22.4 mm sizes to water bound macadam (wbm g-3) specification including spreading of in uniform thickness hand packing, rolling with smooth wheeled roller 8/10 ton in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per technical specification clause 405. construction of shoulder with approved material obtained from borrow pits with all lift & lead transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 . as per technical specification clause 301.5 providing and applying tack coat with bitumen 80/100 using tar boiler / pressure distributor at the rate of 0.30 kg. per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503. providing, laying an
Sector: PWD