Details: site clearance i/c cutting grasses brushes and small trees i/c its removal from site of work. as per mort 2.1 excavation in foundation in ordinary soil[ loame, clay or sand] inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches.as per si. no. 251 providing and laying cement concrete 1:4:8 (1 cement : 4fine sand :8 graded brick aggregate 40 mm nominal size) including supply of all materials,labour and t&p etc required for proper completion of the work and curing complete also including cost of formwork in foundation and floors..as per s i no.275 m-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants etc.
Sector: RDPR