Details: earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. asper s.i.no.-253 excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. as per si no-251.schedule rate concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and t & p etc,required for proper completion of the work.as per si no-273 first class b/w in 1:4 in cement and fine sand mortar in foundation and plinth including supply of all materials, labour and t&p etc required for proper completion of work. asper s.i.no.305(b) supply and laying of 125 micron polything in betweenlean concrete and c.c slab. constrution of unreinforcement dowel, dowel jointed at expansion joint at m30 (grade0 design mix as per mord 1501 12mm thick cement plaster in 1:4 ceme
Sector: RDPR