Details: excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 (including all taxes, labour cess, t&p and material but excluding gst) providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 ( pcc - m 10 ) (1:3:6)(nominal mixing) (including all taxes, labour cess, t&p and material but excluding gst) r.c.r. stone masonry work in 1:4 cement and course sand mortar in foundation including supply of material, labour and t&p for proper completion of the stone khanda complete as per drawing and technical specifications 702, 704, 1202, 1204 &mord no.700/12.4.(including all taxes, labour cess, t&p and material b
Sector: PWD