Details: (a) bituminous workproviding laying spreading and compacting stone aggregates of water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel roller 80-100 tonnes in stages to proper grade and camber applying and brooming requisite type of screening/binding materials to fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per technical specification clause 405. (including all material, t&p, labour cess etc. but excluding g.s.t.) providing and applying tack coat with bitumen vg-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503. (including all material, bitumen t&p, labour cess etc. but excluding g.s.t.) providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 (13.2mm & 11.20mm in 2:1) mm aggregates using grade bi
Sector: PWD