Details: earthwork filling / levelling upto 5km distance. excavation in foundation in ordinary soil (clay or sand) including lift upto 1.5 metre (5ft) and lead up to 30m (100ft) and including filling, watering & trimming of excavated earth into the trenches or into the space between the building and the side 5km carted up to site.. si no-251 supply and laying of sand cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1 : 6 : 12 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. si no-273 ist class brick work in boxing with below plinth with 1 : 6 cement sand mortar i/c all material labour t&p etc complete. as per si no-303 laying of cc 1 : 1½ : 3 for road 12mm thick plaster work with 1 : 4 cement sand mortar i/c all material, labour etc on outer side of wall work complete. laying of pcc 1 : 1½ : 3 for up to brick work r.c.c. work cement approved coarse sand and 2cm (1.5") gaug
Sector: Urban Authority