Details: excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the e/i up to a distance of 30m. from the foundation trenches including all t&p etc. complete rate as per s.i.no. 251 (schedule rate) cement concrete with 40mm gauge stone ballast, approved coarse sand. and cement in proportion 12:6:1 including supply of all materials labour and tools and plants etc. required for proper complation of the work. in foundation for side brick work rate as per s.i.no. 273 class m 150 sub class ''a'' brick in 1:4 with cement and coarse sand in foundation upto bed level required for proper completion of work. as per si. no. 305b providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel rol
Sector: RDPR