Details: earth work in cutting or filling in embankment patries in ordinary soil, excavation to be done in the form of regular pits not exceeding 1/2m the depth and earth work embankment ot be in 20cm. layers including ramming and dressing the surface to required levels and slopes and also including 1.5 meter (5ft.) lifts and 30m (100ft.) lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m (100ft) as directed by engineer-in-charge including all labour, meterial, royalty and t&p labour cess all taxes complete but excluding gst. providing laying, spereading and compacting stone aggregates (g-3) of specific sizes to water bound macadam specification including speading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, mord specification 405.3 including all labour, meterial, royalty and t&p labour cess all taxes complete but excluding gst. construction of un-reinforced plai
Sector: PWD