Details: submission of design, drawing, testing of bearing capacity of soil and supply of all material, labour t&p etc. and construct as per tenderer's own seismic proof design and drawings (approved by the department) complete intze type on raft or pile raft foundation with columns and braces of 1050 kl/20m, 850kl/20 m,two nos r.c.c. over head tank from made up ground level at site to the top of bottom ring beam of tank, with a minimum free board of 15cm . the design of the tank shall base on safe bearing capacity of soil at site as 8 t/m2 and depth of foundation as 3.00 m from existing ground level on pile/raft foundation. made up level of oht will be taken as 1.00 m above existing gound level. extra earth required for made up level will be arranged by the contractor at his own cost. the work will include testing of bearing capacity of soil at site also from a goverment engineering college such as iit/bhu/amu/nit or as per direction of engineer-in-charge. if the bearing capacity of soil l
Sector: Water supply and Sewerage