Details: boq excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30m from the foundation trenches. (uppwd/sor-2020/251(a)) depth from 0.0 to 1.5 m below g.l. cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (uppwd/sor-2020/281) plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications rcc grade m-25 using batching plant transit mixture and manual placing (morth-20, item no. 15.11/p-656) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in
Sector: Industry Development