Details: supply of 110 mm pvc pipe(6 kg/cm2 ) isi mark etc all comp. supply of 32 mm gi pipe etc all comp. boring work with all lab, t&p etc all comp. (a) 0 to 30 bgl boring work with all lab, t&p etc all comp.(b) l 30-60 boring work with all lab, t&p etc all comp.(c) l 60-90 lowering & jointing of pvc pipe with all lab, t&p etc all comp.(a) 0 to 30 bgl lowering & jointing of pvc pipe with all lab, t&p etc all comp. (b) 30 to 60 bgl lowering of submersible pump set with cable jointing with lab, t&p etc all comp. 1 h.p supply of 1.00 h.p.ksb make oil filled single phase submersible motor pump set, discharge 20000 ltr/h at the head of 45 meter etc including supply of suitable submersible cable & wire rope etc all complete cable 2 core (copper) cable 2 core (copper) clamp 4” gi clamp 32 mm gi solution bush 32 mmx40mm socket 12mmx 32 mm boring cap gate valve nut bolt elbow 32 mmmx25mm 150 mm x 25mm (p) supply & fixing of starter with board etc all complete as directed by sie i/c 1 h.p s/f
Sector: RDPR