Details: item description earth work excavation in ranker kanker mixed hard soil up to bed level lift as below 0.00 to 1.50 1.50 to 4.50 earth work excavation in mar, ranker kanker mixed in satuarated soil below level removal of slush from nala bed c.c. with 1:3:6 cement sand and 25 to 50 mm stone ballast including the cost of materials labour etc. for proper complition of works r.c.r. stone masonary in 1:4 cement sand mortar including the cost of materials labour etc. for proper complition of works r.r. stone masonary work 1:4 cement sand mortar including the cost of materials labour etc. for proper complition of works. c.c. with 1:2:4 cement sand and 10 to 20 mm stone grit including the cost of materials labour etc. for proper complition of works. raised struck pointing with 1:2 cement sand mortar including the cost of materials labour etc. for proper complition of works. 1:3 cement sand mortar plaster on stone masonary of cd dry stone boulder pitching in talus dewatering during construc
Sector: Irrigation