Details: following work is required to be carried out for replacement of gasket of 40 mva, 132/33 kv, imp make t/f-i installed at 220 kv s/s bhadaura. carriage of 20 kl oil tank from 400 kv s/s kasara-mau/ 400kv s/s sarnath or 60 no's empty oil drum from 132 kv s/s zamania/ghazipur or other substations under etd-ghazipur to 220 kv s/s bhadaura (approx. distance 100 km) of capacity 209 ltr. with the help light/heavy vehicle arrange by the contractor on his own cost. the work involve loading and unloading of empty oil drum. including cost of labour and t&p charges. complete draining out the transformer oil up to required level from existing 40 mva, 132/33 kv, imp make t/f-i into empty oil tank or oil drum including opening of drain valves. (approximate 18.50 kl) dismantling of hv/lv & neutral bushing turret from t/f main tank, radiators, conservator tank, prv, buccholz relay, oil pipe line, oltc cap, cooling fans, opening of electrical connection and proper blanking of open space for replacemen
Sector: Transmission