Details: filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. 2.25 preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:4:8 (1 cement : 4 coarse sand (zone-iii) drived from natural sources : 8 graded stone aggregate 40 mm nominal size drived from natural sources). (4.1.8) providing and laying in position ready mixed m-25 grade concrete for reinforced cement concrete work, using cement content as per
Sector: Industry Development