Details: e/w in cutting or in ordainary soil in all complete. diversion of drain water or dewatering & slush cleaning etc all complete as directed by eic. s &l of p c c 1:5:10 & curing all complete. pwd sor si no. 4.1.10 construction of un-reinforced, plain cement concrete pavem thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 m-30 (grade), coarse and fine aggregate conforming to ls 383, maximum size of coarse aggregate not exceedjng 25 mm, expansion, construction and constructionl joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for '14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 . (for agra) pwd sor ch.20 itom no .12 disposal of construction malva 05 km cartage add gst 12% add rs. estemate figer amount
Sector: RDPR