Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead or 1000 m including removal and disposal of top organic soil not exceedingh 150mm in thickness as per technical specification clause 201. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5. earth work in surface excavation 30 cm and above in depth but exceeding 1.50 m width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.50 m as directed by engineer-in-charge all kind of soil. ref to dar 2.6.1 concerete with 4
Sector: RDPR