Details: supply of 450 mm mazza ac pipe class 20. earth work in mar, rankar and kankar mixed soils in digging orin embankment including lead up to 30 m. and lift up to 1.5 m.including dressing making profile and manual compaction butexcluding mechanical compaction with light dressing. as per cdm sor 4.09+4.10 (71.20+81.80=133) sand filling in foundation c.c. work 1:3:6 of cm in stone grit 19 mm class-150 brick work in 1:4 cement and fine sand of 1.25 fineness and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work r.c.c. work 1:2:4 of cm in stone grit 19 mm for construction of silt chaember cover reinforcement for chember cover jointing of pipe line with socket including cost of all skilled labour, t & p for jointing material and all specials, required as per site conditions the work include aspects of pipe line also. lowering in the same into already prepared trenches and laying true to alignment
Sector: Irrigation