Details: earthwork in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 indepth and also including 1.5m lift & 30m lead including but top 30 to 50 cm including hire & fuel charges of road roller and water etc required for proper complition of the work as per direction of e/i of the work in as per si no. 253 excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the e/i up to a distance of 30m. from the foundation trenches including all t&p etc. complete rate as per s.i.no. 251 c.c. with 40 mm gauge brick balasst,c/sand & cement in the proportion of including 1:5:10 supply of all materials labour t&p etc. complete required for proper completion of the work as per s.i. no. 274 m-150 class b/w in 1:4 cement & coarse sand finencess modulous mortar in foundat
Sector: RDPR