Details: earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom. lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. all kinds of soil. (morth/a.r./yeida/based on uppwd/sor-2020)) depth from 0.0 to 1.5 m below g.l. earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom. lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. all kinds of soil. (morth/a.r./yeida/based on uppwd/sor-2020)) depth from 1.5 to 3 m below g.l. cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (uppwd/sor-2020/281) centering and shuttering including strutting, proppin
Sector: Industry Development