Details: laying and jointing pvc pipe. heading earthwork in silt clearance i/c lift upto 1.50 m and lead upto 30 m. dressing. (the earth from clearance to be used in side embankment or to be disposed on spoil banks or as directed by (engineer-in-charge). heavy jungle clearance including cutting elephent grass and throny bushes in tarai i/c disposal beyond 30 m. scraping existing internal section cutting /filling up to 8 cm i/c all labour t&p etc. complete.
Sector: Irrigation