Details: as below excavation in foundation soil (loam clay or sand) including left upto 1.5 meter (5fts) and lead upto 30 mtr (100 fts) & including filling watering and ramming of excavated earth in to the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as director engineer in charge up to distance of 30m (100 fts) from the foundation trenches.(as s.i. no. 02 ) 2.8 providing & laying cement concreet 1:6:12 40mm gauge brick ballast etc. as per ar class 150 brick work in 1:4 cement and c-sand etc. as per sor chp. 06 item no 1.0 (6,1.1) in foundation class 150 brick work in 1:4 cement and c-sand etc. as per sor chp. 06 item no 1.0 (6,4.1) in s.s. anti termite treatment in foundation etc. as per sor chp. 5 item no 2.0 (4.2.3) earth in embankment in ordinary soil i/c lead 30mt. & lift 1.50 mt. winth cartage 5.0 km distance to done from regular pits etc 12mm thick plaster with cement approved c-sand in
Sector: RDPR