Details: excavation in foundation in ordinary soil,loam,clay or sand i/c lift upto 1.5m &lead upto 30m i/c filling watering &ramming of excavated earth into the trenches or into the space between the building & the side of foundation trenches or into the plinth removal &disposal ofsurplus earth as directed by the e/i upto a distance of 30m from the foundation trenches.si-251 cement concrete with 4cm gauge approved stone ballast,approved coarse sand and cement in proportion of 8:4:1i/c supply of all material ,labour and t&p etc. required for proper completion of the work.si-281 earth work in cutting or in embankment in ordinary soil,excavation to be in the regular pits not exceeding 0.5min depth and earth work in embankment to be in 20cm layers,i/c ramming and dressing the surface to required levels &slopes &also i/c 1.5m lift and 30m. lead .the earth from cutting to be used in making embankment or to be disposited as spoil bank with in 30m. distance as directed by the e/i.si-253 r.c.c. work wit
Sector: RDPR