Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to requires and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000m as per technical specification clause 301.5 laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth over brick soling watering, and rolling as per technical specification clause 412for curve supply & fixing of sign board at site etc. all complition of work.
Sector: RDPR