Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause-301.5. laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross- section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 kn as per technical specification clause 412 dsr no.412 supply/ laying in position of above 350 mm dia np-3 hume pipe s/f of granite stone sign board with all stages photo of work….. add :- gst
Sector: RDPR