Details: dewatering of the pound…… excavation foundriion in orciinary soil (loam, clay or sand) lncluding lift upto '1.50 m and lead upto 30m and including fllling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer ln charge upto a distance of 30m from the foundation trenches. mannual (small work) as si. no. 251 providing and laying cement concrete in 1:4:8 (1cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete, lncluding cost of form work. in foundalion and floors as dsr no. 4.1.8 coursed rubble masonry (first sort) with hard stone in superstructure above plinth level and upto floor five level. 1:6 ('l cement : 6 coarse sand) as dsr no. 7.8 pointing on stone work with cement mortar 'l:3 (1 cement 1: 3 coarse sand) :flush/ ruled pointingas dsr no. 13.33.1 providing and laying cement concret
Sector: RDPR