Details: dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in- charge within a distance of 60 metre (200 feet). pwd sor 2022 17.3 taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of engineer-in-charge. dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200feet). earth work in embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. the earth form cutting to be us
Sector: RDPR