Details: earth work in silt clearance of canal including lift up to 1.5 m. and lead up to 30 m. including ramming and dressing by hydraulic excavator/jcb/poclain machine .the earth from clearence to be used in side embankment or to be disposed off at spoil banks or as directed by engineer-in-charge. uprooting sarpat moonj and jhunds from canals bankincluding its disposal.
Sector: Irrigation