Details: 109 dewatering pump 10 hp scraping old white or colour wash including disposal of refuse as directed by the engineer-in-charge within a distance of60 metre (200 feet). earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m. distance as directed by the engineer incharge. excluding royallity. wherever applicable for small work or abadi area. (where machine con not reach/move) first class brick work in (1:4) cement & four coarse sand 2.20 f.m. morter in foundation and plinth and t&p etc all completed as per the direction of engineer - in - charge. (as per pwd sor 2022 page no 20 si no 6.05 item no 305 (a) 12 mm thick plaster with cement and c
Sector: RDPR