Details: silt clearance and scrapping work between km. 0.000 to km. 8.870 of ayar dy . silt clearance/trench digging including lift up to 1.5 and lead up to 6m, including cost of driver/assistant driver,pol,maintenance of machine,contractor profit taxes etc but excluding leveling,dressing & compaction. scraping internal section of existing channel i.e. bed & with silt up to 5cm.
Sector: Irrigation