Details: constn. of patri with approved materials obtained from borrow pits with all lifts and leas, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.1 & 300.2 with lead upto 1000m. as per technical specification clause 301.5(by carted earth) g.s.b.(granular sub base) for filling in rain cut trenches as per drawing and technical specification providing and laying boulders apron on river bed for protection against scour with stone boulder weighing not less than 40kg. each complete as per drawing and technical specification. brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications. plain cement concrete m25 mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. struck cement pointing in 1:2 cement and fine sand mortar complete in all respect. as per mo
Sector: PWD