Details: taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge. dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in- charge within a distance of 60 meter (200 feet).pwd sor 2022 17.2.2 s/l p:c:c (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ as per pwd sor 2022 page no 18 si no 5.01 item no 273 } first class brick work in (1:4) cement & four coarse sand 2.20 f.m. morter in foundation and plinth and t&p etc all completed as per the direction of engineer - in - charge. (as per pwd sor 2022 page no 20 si n
Sector: RDPR