Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by engineer-in-charge: dsr 2023 i.no-2.1 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) dsr 2023 i.no 4.1.11 brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1 cement : 4 coarse sand) dsr 2023 i.no-6.1.1 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) dsr 2023 i.no 13.4.1 dismantiling interlocking tiles work in floor/roads laid in dry sand including stacking with 50m lead for thickness of tile 60to 80mm. sor 23-24 page no 51 si.no 22 providing and piacing in position 100mm thick factory made machine batched & machine mixed precast rcc rectangular cover on drains of footpath of various size,
Sector: Urban Authority