Details: holles filling with wmm i/c cost of all material, labour, t&p etc. complete work. as per direction of e/i. filling -holes and patch repairs with bituminous concrete, 30mm. removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Sector: PWD