Details: the quantities given here under are tentative. they can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. compacting original ground l: (i) compacting original ground supporting embankment : loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per technical specification clause 301.4.1 (sor . 12b.9) water bound macadam grade iii: providing, laying, spreading and compacting stone aggregates of specific sizes (grading-iii 53 mm to 22.4 mm specified size) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8
Sector: Irrigation