Details: earth work in excavation in trenches for foundation pipes, cable etc in ordinary sol (loam clay or sand) inlcuding lift upto 1.5 mt. lead upto 30mt. and dressing of sides and rammings of bottom and disposal of surplus excavated earth as directed by the engineer. upto 1.5m depth excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. class-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour tools and plants, etc. required for proper completetion of the work. class-150 brick work in 1:6 cement and coarse sand
Sector: Infrastructure