Details: cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms. measured at a height of 1 m. above ground level and removal of up to a distance of 50m. out side the periphery of area cleared. demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of e/i. in cement mortar demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 1.5m, as directed by e/i. the contractor has to detect different utilities like sewer line, water supply
Sector: Industry Development