Details: making bandha in size naala with sand bags, soil and other ways … etc …………………. including all complete. earth work filling with ordinary soil excavation to be in the form regular pits note excluding 0.5m in depth and earth work embankment to be in 20 cm layers including ramming and dressing the surface to required slows and also including 1.5m, lift and 30 m lead in all complete. site up to 10 km distance. (as per analysis of rate) deduct excavated earth dewatering naala by using 20hp pump …………………. including all complete. earth work cutting in ordinary soil including ramming and dressing the surface to required slows and also including 1.5m, lift and 30 m lead in all complete. site up to 10 km distance. (as per analysis of rate) disposal of malba from site with cartage up to 8km distance including loading & unloading, t&p etc. required for proper of work as direction by engineer-in-charge. (pwd sor 2017-18, chepter-3, item no. 231a ) dewatering fron pond using 20 hp pump machine
Sector: RDPR