Details: excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.5 m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge up to a distance of 30m. from the foundation trenches. excluding gst demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge.nominal concrete 1:3:6 or richer mix (ic equivalent design mix cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work m-150 brick work in 1:6 cement & coarse sand 1.25f.m mortar in foundation and plinth including supply of all materials labour complection of the work uppwd sor 303 c
Sector: Industry Development