Details: excavation of earth in ordinary soil for laying of sewers including cutting of joints, pits, , dressing, leveling, including removal of surplus earth and other dismantalled materials upto distance of 50m from centre of trenches cartage of earth or fly ash when added to schedule item no-253 lead upto 1km rate as per sor-2022 s.no.4.11 item no-261 supply and stacking of 22.4 - 53mm gauge hard stone ballast from approved quarry for top coat including cartage royalty octroi, sales tax & all other taxes what so ever applicable under rules and required template after screening at road side including dressing of side berms as required where metal is to be staked as per direction engineer in charge.rate as per analysis. supply & stacking of screening material approved quality of consolidation of stone ballast including all material] labour] t&p etc. required for proper completion of the work.rate as per analysis. consolidation of 10cm thick (loose) coat of stone ballast including opening out
Sector: Industry Development