Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead up to 1000 m as per technical specification clause- 301.5 laying brick soling layer on prepared sub-grade with brick on edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling as per technical specification clause 412 same as item no. 1 but in side patri supplying and fixing of innugration stone woth writing wprk and providing two photograph after its fixing and labour etc. complete.
Sector: RDPR