Description: Construction work of wedding procession in village Parsera Bisauli Name of Work Construction work of wedding procession in village Parsera Bisauli
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil (DSR 2021 INo-2.8.1) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 2021 I No 4.1.8) Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 2021 Item No-6.1.2) Excavating ,Supplying , stacking and filling of local earth (including royalty ) by mechanical transport upto a lead of 1 km also including ramming and watering of the earth including all complite as per DSR -2023 S.I.NO..2.25 (a) Brick work with comm
Sector: RDPR