Details: maintenance of wbm road including filling up of holes, ruts and rectifying corrugated surface, damaged deges and ravelling as per technical specification clause 1906 (excluding gst) repair to holes and removal of loose material, trimming of sides, cleaning of surface, providing tack coat, 20mm thick premix carpet and seal coat type b as per drawing and technical specification clauses 1904.2, 503 and 508.1 (including cost of bitumin & excluding gst)
Sector: PWD