Details: levelling and dressing of road surface (4 cm deep) including cutting/filling including labour, t&p etc., complete in all respect as per direction of engineer-in-charge. excluding gst. earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and as per level given at site including cost of all labour and t&p etc. dressing & disposal of earth by head load on spoil bank of river on shore complete in all respect as per direction of engineer-in-charge. excluding gst. earth work in cutting or filling in embankment for cambering of approach link road including proper longitudinal and side grade and as per level given at site including cost of all labour and t&p etc. dressing & disposal of earth by head load on spoil bank of river on shore but for 2 km extra lead for kagar cutting/filling complete in all respect as per direction of engineer-in-charge. excluding gst. cartage, laying and fixing of r s joists from centra
Sector: PWD