Details: excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilizing the remaining earth locally for road work. as per morth specification clause no. 304 complete in all respects. granular sub-base with graded material (table:- 400-1) construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. as per morth technical specification clause no. 401 interlocking concret block pavement providing and laying interlocking concret block pavement having thickness 80 mm as per drawing and technical specifiacti
Sector: PWD